超大型沉井降排水下沉施工 被引量:2

Water dredging construction method of the super scale caisson
下载PDF
导出
摘要 泰州大桥北锚碇沉井基础长67.9m、宽52m、高57m,在沉井下沉的初期,采用降排水下沉。降排水下沉施工成本相比不排水下沉低,且下沉效率高,易控制,可形成良好的下沉导向,并确保沉井的下沉速度和精度,适宜在粉细砂、软塑性亚黏土等地质条件下采用。文章以泰州大桥北锚碇沉井基础为例,介绍了超大型沉井降排水施工的降排水下沉施工工艺。 The dimension of the north anchorage of Taizhou Bridge is 67.9 m long,52 m wide and 57 m high.The water dredging method was adopted at the beginning of the sinking process.The cost of water dredging method is lower than the un drained dredging method and the efficiency is much higher and more controllable.This method can form good sinking direction to assure the sinking velocity and preciseness,especially suitable for the geological condition of clay and clayey.This paper introduced the water dredging construction method of the super scale caisson based on the north anchorage of Taizhou Bridge.
出处 《中国工程科学》 2010年第4期25-28,共4页 Strategic Study of CAE
基金 交通行业联合科技攻关项目(2008-353-332-160)
关键词 超大型沉井 降排水施工 super scale caisson water dredging construction
  • 相关文献

同被引文献14

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部