摘要
通过介绍某危房治理的工程实例,对复杂地质条件下住宅楼进行顶升纠偏作了一定的探索,并就在施工过程中碰到的难点问题提出了解决办法.
Using the given hazardous building as the study case for correcting faulty house,the methods of deviation correction in complex geology conditions are explored and solutions to some problems in the construction process are suggested.