摘要
由于自平衡试桩受力机理的特殊性,施工因素对极限承载力的影响是值得探讨的问题。本文结合某桥梁工程,对采用不同施工工艺成孔的两根自平衡试桩的桩身位移、侧摩阻力以及极限承载力测试及转化结果进行了对比分析,就成孔工艺对自平衡试桩上段极限承载力的影响进行了探讨,指出在一定的土层条件下,成孔工艺因素对自平衡桩极限承载力的影响不容忽视。
Because of the special features on loading mechanism of the self-balancing test pile,it is well worth studying the influence of the self-balancing test pile ultimate bearing capacity from the construction factors.This paper compared the testing data and the conversion results of the displacement,lateral friction,resistance and the ultimate bearing capacity between two piles in a large bridge project with different drilling technology.Based on the results,the influence of drilling technology on the ultimate bearing capacity of the up-pile is analyzed.As the result,the paper shows that the influence of drilling technology on the ultimate bearing capacity of the self-balancing test pile cannot be ignored in certain engineering geological conditions.
出处
《华中科技大学学报(城市科学版)》
CAS
2010年第2期90-94,共5页
Journal of Huazhong University of Science and Technology
关键词
自平衡试桩
施工因素
极限承载力
成孔工艺
self-balancing test pile
construction factors
ultimate bearing capacity
drilling technology