承唐高速公路柴河大桥预应力箱梁吊装方案 被引量:3

Lifting Scheme of Prestrssed Concrete Box Girder of Chai River Bridge on Chengde-Tangshan Expressway
下载PDF
导出
摘要 柴河大桥工程的预应力混凝土梁单件重量大、数量多,且地处山区,施工中采用一台70t汽车吊和一台80t履带吊进行箱梁架设。介绍其预制场布置、运输与安装安排、吊车移动与安装就位等主要的吊装方法与安全技术措施,可供类似工程参考借鉴。 The amount and weight of prestrssed concrete girder component used in Chai River Bridge which is localed in mountain area are great. In the construction,a 70t autocrane and an 80t crawler crane are used to erect box girder. It introduces main lifting methods and safety measures such as the layout of casting yard,the arranging of transport and installation,the move of crane and so on,which can be consulted by similar engineering.
作者 钟永坤
出处 《交通标准化》 2010年第13期222-225,共4页 Communications Standardization
关键词 预应力混凝土箱梁 运输与安装 安全措施 prestrssed concrete box girder transport and installation safety measure
  • 相关文献

参考文献1

  • 1姚玲森.桥梁工程[M].北京:人民交通出版社,2001..

共引文献29

同被引文献9

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部