使用临港新城海域连续1 a的波浪实测资料,并依据码头不利作业标准,进行波浪影响下不利作业天数的分析论证。同时,使用芦潮港同步风资料建立相关关系,利用多年连续风资料推算的波浪影响下不利作业天数进行验证。
According to the standards of adverse dock-operation,the adverse operation days influenced by waves are analyzed and discussed by means of one-year continuous wave-measurement data obtained from April 2005 to March 2006 in the Lin'gang-xincheng sea area.Furthermore the correlation between the Lin'gang wave-measurement data and the Luchaogang synchronous wind-measurement data is calculated,the adverse operation days effected by the waves estimated from the multy year continuous wind data are used to verify the adverse operation days resulting from the one year data.