生产过程时间、成本与质量综合优化研究

The Integrative Optimization of Time,Cost and Quality for Production
下载PDF
导出
摘要 时间、成本与质量是制造企业追求的3大目标,它们相互制约、相互影响,分析三者作用关系和实现综合优化是制造过程非常值得研究的重要难题。根据大量实践调研和总结,剖析了成本、时间和质量的内在相互作用机理,确立了三者之间的影响规律和相互关系。基于关系图,建立了时间-成本-质量综合优化模型。采用精确计算思想设计专门程序对模型进行优化求解。针对一个汽车零件生产实例,详细阐述了所提方法的应用过程,得到一系列优化结果,通过分析求解结果,总结出对企业管理人员非常有价值的结论。实例验算表明,提出的方法可以有效辅助生产决策。 Time,cost and quality are three central objectives which the manufacturing enterprises seek,but they restrict and affect each other. The relations analysis among three objectives and their exact optimization during manufacturing are the important. Based on the practice investigation and reasoning,it analyzes the action mechanisms of three objectives,and ascertaines their effect rules and relations. Based on their relations,it builds the optimization model of time-cost-quality,designs the special program for the integrative optimization model with the idea of accurate calculation,and obtains the optimization solution. It uses the methods to the instance about car part manufacturing,shows that the conclusions are valuable for the manager in enterprise. The instance application indicates that the model and the methods can help to make decision for production.
出处 《中国制造业信息化(学术版)》 2010年第7期18-21,共4页
基金 教育部青年基金资助项目(07JC630038) 广东省自然科学基金资助项目(9451064101002828) 广州市社科规划资助项目(No.08Q04) 华南理工大学中央高校基本科研业务费专项资金资助项目
关键词 工序 时间 成本 质量 优化 Operation Time Cost Quality Optimization
  • 相关文献

参考文献5

  • 1Daisy X M,Zheng S,Thomas N G,et al.Applying a genetic algorithm-based multi-objective approach for time-cost optimization[J].Journal of Construction Engineering and Management,2004 (2):168-176.
  • 2李红仙,宣卫红,谈飞,张云宁.基于激励遗传算法的动态时间/费用优化[J].系统工程学报,2007,22(3):333-336. 被引量:10
  • 3熊鹰,匡亚萍.基于蚁群算法的施工项目工期-成本优化[J].系统工程理论与实践,2007,27(3):105-111. 被引量:29
  • 4Balm J G,Nalina S.Project management with time,cost and quality considerations[J].European Journal of Operation Research,1998,47(2):243-266.
  • 5Khang D B,Myint Y M.Time,cost and quality trade-of in project management:a case study[J].International Journal of Project Management,1999,13(9):122-134.

二级参考文献11

  • 1Daisy X M,Zheng S,Thomas N G,Mohan M.Kumaraswamy.Applying a genetic algorithm-based multiobjective approach for time-cost optimization[J].Journal of Construction Engineering and Management,2004,130(2):168-176.
  • 2Feng C W,Liu L,Burns S A.Using genetic algorithms to solve construction time-cost trade-off problems[J].Journal of Computing in Civil Engineering,1997,11(3):184-189.
  • 3Dorigo M,Gambardella L M.Ant colonies for travelling salesman problem[J].BioSystems,1997,43:73-81.
  • 4Zheng D,Ng S T,Kumaraswamy M.Applying a genetic algorithm-based multiobjective approach for time-cost optimization[J].Journal of Construction Engineering and Management,2004,130(2):168-176.
  • 5Zadeh L A.Fuzzy sets[J].Inf Control,1965,8:338-353.
  • 6Russell A.A comparison of heuristics for scheduling project with cash flows and resource restrictions[J].Management Science,1986,32(10):1291-1300
  • 7Hegazy T,Ersahin T.Simplified spreadsheet solution.II:Overall schedule optimization[J].Journal of Construction Engineering and Management,2000,127(6):469-475.
  • 8Russell A.Cash flows in networks[J].Management Science,1970,16(5):357-373
  • 9Li H,Cao J N.Using machine learning and GA to solve time-cost trade-off problem[J].Journal of Construction Engineering and Management,1999,125(5):347-353.
  • 10Leu S S,Yang C H.GA-based multicriteria optimal model for construction scheduling[J].Journal of Construction Engineering and Management,1999,125(6):420-426.

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部