摘要 如何更好地利用钢管桩支架,来有效的控制在施工过程中的稳定,保证成桥后的受力状态与设计状态高度耦合,是刚构桥斜腿施工控制的重要内容.湖北省援建四川地震灾区的汉源县龙潭沟2#大桥主桥边跨斜腿箱梁施工采用钢管桩支架体系,通过Abaqus建立有限元模型,对刚构桥斜腿支架系统构件的强度、刚度和稳定性进行了计算和分析. How to make better use of the scaffolding supported by steel pipe piles in order to effectively control its stability during construction process and to ensure a highly coupling between the construction and the design is of great significance;and that is an important part in construction control.The scaffolding system supported by steel pipe piles was used in the side span of main bridge #2 at Longtan Channel in Hanyuan County of Sichuan Province;the bridge was aided by Hubei province for the disaster area.By the FEM software ABAQUS,the intensity,stiffness and stability of this scaffolding system components were calculated and analyzed.
出处 《三峡大学学报(自然科学版)》 CAS 2010年第3期45-47,共3页 Journal of China Three Gorges University:Natural Sciences
关键词 钢管桩支架体系 斜腿刚构桥 控制系统 有限元模型 scaffolding system supported by steel pipe piles slant-legged rigid frame bridge control system FEM model
  • 相关文献

参考文献3

二级参考文献3

  • 1[2]张士铎等.箱梁薄壁梁剪力滞效应.北京:人民交通出版社,1998.
  • 2[3]E.L.L Issues and straregies for elvaluation of structural design options.structural engineering iternational,1999,8.
  • 3刘世忠.大跨度预应力斜腿刚构桥的整体模型试验.兰州铁道学院学报,1995,(12):21-26.