摘要
对项目建设单位而言,做好投资控制是进行工程建设的重要工作,也是判断项目建设成功与否的关键。投资控制贯穿建设全过程,但在实际操作中,投资控制工作的深人主要是从项目实施阶段开始的。结合嘉闵高架工程实际,按照项目建设实施程序分别就设计、招投标、合同签订、施工阶段及结算四个阶段简单探讨了项目实施中的投资控制方法,提出了项目实施中各个阶段投资控制工作的要点,借此与其他项目投资控制工作进行一些交流,为今后类似项目建设中的投资控制工作提供一些帮助。
For contractors,investment control plays an important role in construction,and is also the key to determine the project construction successes or not.Though investment control run through the whole construction process,for practical operation,it starts with the implementation of project.Based on practical projects,investment control methods for project implementation was discussed according to the implementation procedure of project construction,including the stages of design,bidding,contract,construction and settlement while the key points for the investment control of each stage were presented.Meanwhile,the communication with other investment control projects was adopted,which provides experience for investment control of further similar projects.
出处
《上海公路》
2010年第2期66-68,共3页
Shanghai Highways
关键词
投资控制
嘉闵高架
实施阶段
Investment control
Jiamin Viaduct
Implementation Stage