宜春明月大桥工程采用V型墩与连续箱梁刚性连接形成V型墩刚构桥。该连续刚构桥构造复杂,且受施工环境因素制约,增加了该桥施工难度。本文结合宜春明月大桥实例,详细阐述V墩刚构箱梁合拢段的施工工艺和技术要点。
Yichun Mingyue bridge engineering using V type pier and continuous rigid connection box girder bridge piers of v-shaped formation. This continuous rigid-frame bridge construction of complex structure, and environmental factors, increases the difficulty of construction. Based on the Yichun Mingyue bridge, detailed V pier rigid-framed girders for folded the construction technology and techniques.
出处
《价值工程》
2010年第20期84-84,共1页
Value Engineering
关键词
宜春明月大桥
合拢段
施工技术
Yichun Mingyue bridge
fold section
construction technology