高架桥预制节段箱梁线型控制技术研究 被引量:3

Study on Alignment Control Technology of Prefabricated Segment Box Girder for Elevated Bridge
下载PDF
导出
摘要 预制节段线型控制是高架桥预制拼装施工工艺成功应用的关键。该文应用线型几何监控技术的理论,结合厦门BRT高架桥的建设实例,介绍采用节段预制及拼装的线型控制技术,为该工艺的推广应用提供经验。 The alignment control of prefabricated segment is the key to successfully apply the prefabrication splicing construction technology of elevated bridge.According to the theory of alignment geometrical monitor technology and based on the construction case of Xiamen BRT elevated Bridge,the article introduces the alignment control technology of segment prefabrication and splicing to provide the experience for the spreading the application of this technology.
作者 饶健辉
出处 《城市道桥与防洪》 2010年第7期39-42,共4页 Urban Roads Bridges & Flood Control
关键词 高架桥 节段箱梁 线型控制 厦门 elevated bridge,segment box girder,alignment control Xiamen
  • 相关文献

参考文献3

二级参考文献5

  • 1王兆祥.铁路工程测量[M].北京:测绘出版社,1988..
  • 2美国州际公路和运输工作者协会.节段拼装混凝土桥梁设计与施工指南[S].2版.1999.
  • 3叶其孝,沈永欢.实用数学手册[M].2版.北京:科学出版社,2006.
  • 4[2]孔祥元,梅是义.控制测量学[M].武汉:武汉大学出版社,2003
  • 5[3]Construction and Design of Prestressed Concrete Segmengtal Bridges,Walter Podolny,Jr.& Jean M.Muller,1982