汕头市第二条过海水管顶管工程导向测量

Guidance Surveying of Shantou No.2 Crossing-sea Water Supply Pipe Jacking Project
下载PDF
导出
摘要 该文以汕头市第二条过海水管顶管工程为例,确定了该顶管的贯通误差指标,对顶管导向测量期间的几项测量工序进行了横向误差的分配,包括控制测量,顶进孔和接收孔中心坐标测量,工作井内导向短基线测量,以及顶管施工过程中工具头后座中心的偏差测量等。通过该导向测量最终保证顶管的顺利贯通。 Taking Shantou No.2 Crossing-sea Water Supply Pipe Jacking Project as an example,the article defines the run-through error index of this pipe jacking,and distributes the transverse error of several surveying procedures during the guidance surveying of pipe jacking,including the control surveying,the central coordinate surveying of jacking hole and receiving hole,the guidance short-baseline surveying within the working shaft and the deviation surveying at the backseat center of tool head in the course of pipe jacking construction finally to guarantee the smooth run-through of pipe jacking.
作者 仲子家
出处 《城市道桥与防洪》 2010年第7期110-112,共3页 Urban Roads Bridges & Flood Control
关键词 顶管 导向测量 短基线 贯通误差 误差分配 汕头 pipe jacking,guidance surveying,short baseline,run-through error,error distribution,Shantou
  • 相关文献

参考文献6

二级参考文献17

  • 1郑崇启,梁玉保,李建民.大比例尺地面数字测图的精度分析[J].测绘通报,2004(11):42-44. 被引量:6
  • 2梁玉保,押朝伍,王孟波.全站仪顶管施工测量控制系统[J].测绘科学,2007,32(4):166-167. 被引量:5
  • 3邵自修.工程测量[M].北京:冶金工业出版社,1999.43-82.
  • 4程文华,郑金淼.复兴东路电缆越江顶管施工测量技术[A].2003上海国际隧道工程研讨会论文集[C].2003.
  • 5范品刚 倪昆萍 李远义.谈手掘式直线顶管施工偏差测量与纠偏的监理实践.云南建设监理,2008,(5):26-27.
  • 6Benecke N, Kalz U. Ensuring Tunnel Navigation by Cost-Effective Gyroscope Control Measurements [J]. Tunnelling and Underground Space Technology, 2006,21(3):253.
  • 7Xu Tao, Lu Haibao, Dong Wenjuan. Method for Determining Pitch and Roll of the Boring Tool with Micro-machined Accelerometers[C]. The 5th International Symposium on Test and Measurement, Shenzhen, 2003.
  • 8候学渊 钱达仁 杨林德.软土工程施工新技术[M].合肥:安徽科学技术出版社,1999.39-42.
  • 9马·谢尔盖.顶管工程.北京:中国建筑工业出版社,1983.
  • 10季斌德,邵自修.工程测量[M].北京:测绘出版社,2002-01.

共引文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部