摘要
苏州河三期整治工程防汛墙加固工程在实施过程中,重点需要解决沿线的交通组织和疏导问题。该文通过设计阶段利用工程自身特点和工程所在地的交通条件,对提出的交通组织和施工堆场的布置方案进行了总结。
In the implementing process of Suzhou River Phase III Harnessing Engineering Floor Control Reinforcing Project,the focus is required to solve the traffic organization and dispersion problem along the line.The article sums up the layout scheme of traffic organization and construction storage yard according to its engineering characteristics of the design stage and the traffic condition of the project field.
出处
《城市道桥与防洪》
2010年第7期136-139,共4页
Urban Roads Bridges & Flood Control
关键词
苏州河三期
防汛墙加固
交通组织
堆场布置
Suzhou River Phase III,reinforcing of floor control wall,traffic organization,layout of storage yard