摘要 评估因径流和电价的不确定性带来的风险,是水电厂在参与电力市场竞争必须考虑的一个重要问题。考虑影响水电厂收益的各种风险,主要包括水电厂参与竞价的电价风险和由于季节等因素引起的电量不确定性风险及它们之间的相关性,提出了计算电力市场VaR的方差-协方差参数法模型并结合具体实例对水电厂的收益进行了短期金融风险评估。分析结果表明,方差-协方差参数法能较好预测第二天竞价机组的清除电价,为水电厂更准确地降低收益风险值打好基础。 It is important for hydropower plants to assess the risk from the uncertainty of inflow and power price in the electricity market.Considering electricity price risk caused by bidding price and energy-uncertainty risk caused by season factors that influence the profit of hydropower plants and their pertinence,this paper puts forword variance-covariance parameter approach of value at risk(VaR) combining the concrete example to assess the short-term financial risk for income of the certain hydropower plants.The analysis shows that variance-covariance parameter approach can forecast precisely clearing price of bidding units the day after to lay a good foundation for decline return risk of hydropower plants.
机构地区 青海大学
出处 《电力系统保护与控制》 EI CSCD 北大核心 2010年第14期12-15,27,共5页 Power System Protection and Control
关键词 电力市场 水电厂 电价风险 电量不确定性风险 风险价值 方差-协方差参数法 electricity market hydropower plants electricity price risk energy-uncertainty risk value at risk variance-covariance parameter approach
  • 相关文献

参考文献10

  • 1Dahlgren R,Liu C C,Lawarree J.Risk assessment in energy trading[J].IEEE Trans on Power Systems,2003,18(5):503-511.
  • 2张显,王锡凡,王建学,胡泽春.发电商长期电能分配策略研究[J].中国电机工程学报,2005,25(1):6-12. 被引量:51
  • 3Bjorgan R,Liu C,Lawarree J.Financial risk manage-ment in a competitive electricity market[J].IEEE Trans on Power Systems,1999,(14):1285-1291.
  • 4Ardrews C.Evaluting risk management strategies in resource planning making[J].IEEE Trans on Power Systems,1995,(10):420-426.
  • 5Song H.Optimal strategies for electric energy contract decision making,doctoral dissertation[D].Seattle:Univ of Washington,2000.
  • 6Oren S S.Integrating real and financial options in demand-side electricity contracts[J].Decision Support System,2001(30):279-288.
  • 7Michael Denton,Adrian Palmer,Ralph Masiello,et al.Managing market risk in energy[J].IEEE Trans on Power Systems,2003,18(2):494-502.
  • 8Dahlgren Robert,Liu Chen-Ching,Lawarree Jacq-ues.Risk assessment in energy trading[J].IEEE Trans on Power Systems,2003,18(2):503-511.
  • 9Jorion P.Value at risk:the benchmark for controlling market risk[M].New York:Mc Graw-Hill,2005.
  • 10Morgan J P.Risk metrics-technical document[M].Fourth edition.New York:Morgan Guaranty Trust Company,1996.

二级参考文献22

  • 1高鑫,王秀丽,雷兵,王锡凡.独立发电商的策略报价研究[J].中国电机工程学报,2004,24(7):41-46. 被引量:56
  • 2宋依群,倪以信,侯志俭,吴复立.基于均衡分析的总统调合同电量比例研究[J].中国电机工程学报,2004,24(7):64-67. 被引量:16
  • 3赵新宇,王锡凡,陈皓勇.火电厂投资风险决策的模型与整体框架[J].中国电机工程学报,2004,24(8):7-11. 被引量:30
  • 4周浩,康建伟,陈建华,包松.蒙特卡罗方法在电力市场短期金融风险评估中的应用[J].中国电机工程学报,2004,24(12):74-77. 被引量:92
  • 5Wen F S, David A K. Optimal bidding strategies and modeling of imperfect information among competitive generators [J]. IEEE Transactions on Power Systems, 2001,16(1): 15-20.
  • 6Wen F S, David A K. Optimally co-ordinated bidding strategies in energy and ancillary service markets [J]. IEE Proc-Gener. Transm.Distrib, 2002, 149(3): 331-338.
  • 7Elia E, Maiorano A, Song Y H, et al. Novel methodology for simulation studies of strategic behavior of electricity producers [C].Proceedings of IEEE Power Engineering Society Summer Meeting,Washington (USA): 2000.
  • 8Yang He, The studies of bidding strategies of generators in electricity markets [D]. Ph D Dissertation. Department of Electronic and Computer Engineering, Burnel University, West London (UK): 2002.
  • 9David A K, Wen F S. Bilateral transaction bargaining between independent utilities under incomplete information [J]. IEE Proc-Gener. Transm. Distrib, 2001, 148(5): 448-454.
  • 10Campo R A. Probabilistic optimality in long-term energy sales [J].IEEE Transactions on Power Systems. 2002,17(2): 237-242.

共引文献50

同被引文献55

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部