摘要
针对静17块开发中单井产量递减快,注水开发效果差的状况,为做到合理、高效开发油藏,在综合分析沙三段下部岩性、物性、剩余油分布等特征,以及成功实施静33-侧平71井的基础上,对该断块侧钻水平井整体部署的方案进行了研究。
In accordance with the situation of fast reduction in single well production and bad result of water injection development for Block Jing17, in order to develop the reservoir reasonably and effectively, on basis of comprehensive analysis of lithologies, petrophysical properties, oil-bearing formation and residual oil distribution in lower S3, and successful drilling of Well Jing 33-CP71, this paper studies the preliminary plan of integrated deployment for sidetracking horizontal well.
出处
《断块油气田》
CAS
1999年第1期40-43,共4页
Fault-Block Oil & Gas Field
关键词
侧钻
水平井
钻井方案
定向钻井
Sidetracking, Horizontal well, Project, Development