1Tonon F,Mammino,A,Bernardin,i A.Multiobjective optimization under uncertainty in tunneling application to the design of tunnel support/reinforcement with case histories[J].Tunnelling and Underground Space Technology,2002,17:33-54.
1J.A.Richards.Inspection,Maintenance and Repair of Tunnels:International Lessons and Practice[J].Tunneling and Underground Space Technology, 1998,13:369-375.
2VCarr,J.H.M.Tah.A Fuzzy Approach to Construction Proect Risk Assessment and Analysis:Construction Proiect Risk Management System[J].Advances in Engineering Software,2001,32:845-857.
10Qu Jili,Ge Xiurun. Research on characteristics of the lateral settlement trough caused by shield construction[J].Journal of Shanghai Jiaotong University,2006,(04):525-530.