摘要
介绍了通州新城滨河森林公园种植工程概况,设计了施工组织,包括施工准备、施工组织结构的设置及主要施工方案与措施,最后分析了施工重点与难点。
The general situations of planting engineering of Tongzhou Xincheng Forest Park were introduced,construction organization which including construction preparation,setting of construction organization structure and construction scheme were designed,at last the main and difficult points were analyzed.
出处
《安徽农业科学》
CAS
北大核心
2010年第16期8807-8808,共2页
Journal of Anhui Agricultural Sciences
关键词
园林施工组织设计
种植工程
技术指标
Landscape construction design
Planting project
Technical standard