大型、高层建筑物需装备的机电设备、管道及线网众多。由于多个专业施工队伍拥挤于现场,按各自的施工图纸进行施工,给施工管理带来难度,影响作业效率低。因此,对于大型建筑的施工,必须做好机电安装前期图纸会审,安装时管线综合布局,以保障工程质量,降低工程施工成本。
Large,high-rise buildings should be equipped with mechanical and electrical equipment. As the number of professional construction team and respective construction drawings for construction and construction management of difficult to affect the operational deficiencies. Therefore,large-scale building construction,mechanical and electrical installation must be done early drawings reviewing, pipeline installation, comprehensive layout, to ensure quality, reduce engineering facilities.
出处
《湖南农机(学术版)》
2010年第3期164-165,共2页
Hunnan Agricultural Machinery
关键词
机电设备安装
管线综合
工程质量
mechanical and electrical equipment installation
pipeline synthesis
project quality