摘要
介绍了小湾大坝5#泄洪中孔钢衬底板浇筑所使用的手段及新方法,利用新方法浇筑钢衬底板仓,能够最大限度的保证钢衬底部与混凝土不脱空,结合密实。
This paper introduces a new method used in concrete pouring of No.5 flood discharge middle hole steel liner motherboard of Xiaowan Dam.Using the new method can guarantee that the bottom of the steel liner integrates densely with concrete efficiently.
出处
《黑龙江水专学报》
2010年第2期59-61,77,共4页
Journal of Heilongjiang Hydraulic Engineering College
关键词
泄洪中孔
钢衬底板
浇筑
U型槽
flood discharge middle hole
steel liner motherboard
pouring
U-slot