期刊文献+

大屯矿区井下辅助运输系统改造设计 被引量:10

Reconstruction Design on Mine Auxiliary Transportation System in Datun Mine
下载PDF
导出
摘要 为了提高大屯矿区井下辅助运输系统的运输效率,合理解决采区运人问题,结合矿井的实际条件,对采区辅助运输系统提出了"无极绳绞车牵引+卡轨车系统"、"柴油机齿轨车+卡轨车系统"2种改造方案,并进行比较和优选。改造方案对类似矿井辅助运输系统具有一定的指导意义。 In order to enhance the efficiency of auxiliary transportation system and solve the question that workers can not be transported in the district of the Datun Mine, two schemes that "Endless-rope haulage +Rail car system" and "Rack track car with diesel + Rail car system" were presented according to the actual condition of the Mine, then compared the two schemes and chose the optimal one. The design will have a certain reference value to the mine auxiliary transportation system with the similar mine condition.
出处 《煤矿机械》 北大核心 2010年第8期184-185,共2页 Coal Mine Machinery
关键词 辅助运输 无极绳牵引 齿轨车 卡轨车 auxiliary transportation endless-rope haulage rack track car rail car
  • 相关文献

同被引文献21

引证文献10

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部