摘要 公伯峡水电站主变高压侧至330 kV开关站之间的高压单芯电缆护层的接线方式是电缆一侧终端经保护器接地,另一侧终端采用直接接地方式接地,在运行过程中330 kV电缆护层接地线发生过热现象。针对接线方式中存在的问题,提出处理对策。 The wiring mode of highvoltage single core cable sheathing from main transformer high voltage side of Gongboxia hydropower station to 330kV substation adopts grounding through protector on one terminal and direct grounding the other terminal,the 330kV cable sheathing grounding wire occurred overheating phenomenon during operation.The paper proposes the problems and solution in wiring mode of highvoltage single core sheathing between main transformer highvoltage side of Gongboxia hydropower station and 330kV substation.
作者 赵滨 郭增寿
出处 《青海电力》 2010年第2期30-33,共4页 Qinghai Electric Power
关键词 公伯峡水电站 高压电缆 护层保护 接地 Gongboxia hydropower station highvoltage cable sheathing protection grounding
  • 相关文献

参考文献1

二级参考文献4

  • 1GB50217-94.电力工程电缆设计规范.北京:中国计划出版社,1995.
  • 2DL/T620-1997.交流电气装置的过电压绝缘配合.北京:中国电力出版社,1997.
  • 3DL/T621-1997.交流电气装置的接地.北京:中国电力出版社,1997.
  • 4DL/T401-91.高压电缆选用导则.北京:水利电力出版社,1991.

共引文献23

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部