摘要
针对高地下水位的沿海地区,依据规范,对某实际工程进行了基坑支护,以及基坑在施工过程中的监测,得出基坑支护设计的成败不仅取决于设计者是否掌握正确的设计方法,也取决于施工过程中的监测与施工方法和技术措施。
Based on high ground water of the coastal areas,according to the standard,deep excavation supporting to a practical engineering and deep excavation monitoring in construction process,it follows that the success or failure of the deep excavation supporting design,not only depends on whether the designer has right design method,but also depends on the monitoring and construction methods and technical measures of construction process.
出处
《山西建筑》
2010年第21期82-83,共2页
Shanxi Architecture
关键词
深基坑
支护
监测
deep excavation
support
monitoring