摘要
以古城矿井副井围墙施工为例,介绍了加筋土挡土墙技术的应用,对加筋土挡土墙施工工艺进行了总结,具体阐述了面板安装、拉筋带铺设、填料施工三个环节的操作方法和施工要点,以期指导实践。
Taken the construction work of enclosing wall of the auxiliary shaft in Gucheng mine,the application of reinforced earth retaining wall is introduced.The construction technology of reinforced earth retaining wall is summarized.From three aspects installation of face slab,layout of bar strip and filler construction practical operation methods and key points for construction are elaborated in order to instruct practice.
出处
《山西建筑》
2010年第21期101-102,共2页
Shanxi Architecture
关键词
加筋土挡土墙
面板
拉筋带
优点
reinforced earth retaining wall
face slab
bar strip
advantage