摘要
重点介绍了立井快速施工的机械化配套原则、中深爆破掏槽方式及其参数的选择、光面爆破参数的确定、混凝土搅拌方式及输料方法和加强施工组织管理等措施,通过这些关键技术在工程实践中应用获得了较快的施工速度,从而缩短建井工期,节约工程成本。
This text has introduced the principle of in the mine's construction,the way of undermine blasting in mid-depth and the selection of its parameters,the confirmation of the parameters in smooth blasting,the way of concrete batching and its diverging way,and the enhance of construction management. Through these key technologies have achieved the faster construction progress in engineering practice,so that to shorten the construction period of well building and save the project cost.
出处
《山西建筑》
2010年第21期126-127,共2页
Shanxi Architecture
关键词
立井井筒
机械化配套
中深孔爆破
施工组织管理
the pit shaft in standing well
mechanical complement
mid-depth blasting
construction organization management