摘要
以青沙山隧道工程为例,介绍了寒区特长公路隧道施工过程中不断改进开挖施工方法,使其质量取得预期的效果,通过施工过程位移监控量测分析,确保了隧道施工安全。
With the Green sand mountain tunnel project as an example,it introduced the method of continually improving the excavation during highway tunnel construction process in cold regions,so that it helps to achieve the desired result in quality.Through the displacement monitoring measurement in the construction process,it ensures the tunnel construction safety.
出处
《山西建筑》
2010年第21期339-340,共2页
Shanxi Architecture
关键词
公路隧道
防排水工艺
质量控制
highway tunnel
waterproofing and drainage technology
quality control