摘要
列举了核电建设工程中各施工承包商理化实验室对于实验室规定检验项目中常出现的问题,分析了出现相关问题的原因,针对各种问题提出了解决方法,有助于加强实验室的管理,从而更有效地服务于工程建设。
The problems happened frequently in the trade contract inspection items in the construction contractor laboratory in the nuclear power construction project were showed, the reasons to these problems were analyzed, and the solutions were suggested to strengthen the management of the laboratory, and it can provide good service to the construction project.