沙钢污水处理及回用工程处理规模为4.0×104m3/d,采用配水井/气浮池/BAF/中间水池/全自动净水器的工艺流程。实际运行表明,处理效果较好。介绍了各工艺单元的设计参数及运行效果,并总结了设计、运行经验。
The treatment capacity of Shagang Wastewater Treatment and Reclamation Project is 4 ×10^4m^3/d, and the combined process of distributing well, air floatation tank, BAF, intermediate tank and automatic water purification device is adopted. The actual operation shows that the treatment effect is excellent. The design parameters and operation effect of different units are introduced, and the experience in design and operation is summarized.
出处
《中国给水排水》
CAS
CSCD
北大核心
2010年第14期78-80,共3页
China Water & Wastewater