期刊文献+

惠阳污水厂CAST工艺总磷超标原因分析及应对措施 被引量:7

Reason Analysis and Countermeasures for Exceeding-standard TP in CAST Process in Huiyang WWTP
原文传递
导出
摘要 针对惠阳污水厂CAST工艺出水总磷超标问题,对影响生物除磷的因素逐个进行了分析,最后得出导致该厂出水总磷超标的原因是厌氧停留时间不足。为此,增设一台进水泵,增加流量,并将原来的连续进水方式变为间歇进水,最终使出水水质达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级B标准,对总磷的去除率达85%左右。 In order to solve the problem that TP in the effluent from CAST process in Huiyang WWTP exceeds the standard, the factors influencing the biological phosphorus removal were analyzed. It is concluded that the reason for exceeding-standard TP in the effluent is that anaerobic HRT is short. Therefore, an influent pump is added to increase the influent quantity, and the continuous influent mode is changed as the intermittent influent mode, so that the effluent quality meets the first level B criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant ( GB 18918 - 2002). The removal rate of TP is about 85%.
作者 陈航 刘惠成
出处 《中国给水排水》 CAS CSCD 北大核心 2010年第14期131-133,共3页 China Water & Wastewater
关键词 生活污水 CAST工艺 TP超标 domestic sewage CAST process exceeding-standard TP
  • 相关文献

同被引文献34

引证文献7

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部