期刊文献+

含装配约束的作业调度问题及遗传解码算法 被引量:7

Job-shop scheduling problem incorporating assembly constraint and its solution using genetic decoding approach
下载PDF
导出
摘要 传统上加工与装配是分开研究的,而且很少涉及作业装配问题.为此,描述了一种包含加工与装配的作业调度问题.利用FT10基准调度问题的工序数据构造了调度问题及其产品结构.初步进行了以经典作业调度问题(JSSP)为对照的研究.采用基于字符串直接解码的遗传算法,解决了染色体对应不可行调度解的问题.仿真实验验证了遗传解码算法的可行性和有效性,而且进一步表明装配约束改变了JSSP;近优值2046也优于关键路径规则算法的结果. Scheduling for fabrication and assembly operations is researched independently. So far there are relatively less scheduling studies concerning job-shop assembly operation. To solve this problem,a job-shop scheduling problem (JSSP) including both fabrication and assembly constraint operations is described. The problem instance is established on the basis of benchmark FT10 operation data. It was preliminarily investigated by contrasting it to classical JSSP. A selective decoding string was constructed to overcome the unfeasible solutions resulting from chromosomes. Simulation tests indicate that the genetic decoding approach is both feasible and effective. Furthermore,they demonstrate that the assembly constraints have made a great difference in JSSP. Moreover,a near-optimal makespan of 2 046 is obtained,which is better than the result of CP dispatching rule.
出处 《大连理工大学学报》 EI CAS CSCD 北大核心 2010年第4期535-539,共5页 Journal of Dalian University of Technology
基金 "八六三"国家高技术研究发展计划资助项目(2003AA414022)
关键词 装配约束 加工 遗传算法 解码 作业调度问题 assembly constraint fabrication genetic algorithm decoding job-shop scheduling problem (JSSP)
  • 相关文献

参考文献11

  • 1JAIN A S, MEERAN S. Deterministic job-shop scheduling:Past, present and future [J]. European Journal of Operational Research, 1999, 113(2) : 390-434.
  • 2BECK J C. Solution-guided multi-point constructive search for job shop scheduling [J].Journal of Artificial Intelligence Research, 2007, 29 : 49-77.
  • 3ZHANGC Y, LIP G, GUAN Z L, etal. A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem [J]. Computers & Operations Research, 2007, 34(11) :3229-3242.
  • 4吴怡,刘民,吴澄.JSSP基本约束特点分析及调度算法[J].清华大学学报(自然科学版),2004,44(10):1380-1383. 被引量:5
  • 5PINEDO M L. Planning and Scheduling in Manufacturing and Services:Springer Series in Operations Research and Financial Engineering [M]. New York:Springer, 2005.
  • 6曾洪鑫,宾鸿赞,张芬.多品种装配顺序的一种改进遗传算法[J].华中科技大学学报(自然科学版),2006,34(3):39-41. 被引量:2
  • 7吴锋,刘文煌.手工装配作业下的一种调度策略与控制方法[J].清华大学学报(自然科学版),1998,38(2):58-61. 被引量:9
  • 8NATARAJAN K, MOHANASUNDARAM K M, SHOBAN BABU B, et al. Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness [J]. International Journal of Advanced Manufacturing Technology, 2007, 31(7-8) .. 751-761.
  • 9CHENG T C E. Optimal due-date assignment in an assembly shop [J]. International Journal of Operations & Production Management, 1994, 14(2) :31-42.
  • 10HICKS C, PONGCHAROEN P. Dispatching rules for production scheduling in the capital goods industry [J]. International Journal of Production Economics, 2006, 104(1) :154-163.

二级参考文献19

  • 1黄圣国,吕兵,袁信.研究计划管理系统的Petri网论法[J].南京航空学院学报,1989,21(4):69-76. 被引量:6
  • 2周少华,机械工业自动化,1996年,18卷,3期,35页
  • 3陈启申,MRPII.制造资源计划概论,1993年
  • 4吴哲辉(译),Petri网理论与系统模拟,1989年
  • 5杜贤中,中国现代工业企业管理学,1985年
  • 6CHEN Haoxun, CHU Chengbin, Proth J M. An improvement of Lagrangean relaxation approach for job shop scheduling: a dynamic programming method [J]. IEEE Trans on Robotics and Automation, 1998, 14(5) : 786 - 795.
  • 7Dimopoulos C, Zalzala A M S. Recent developments in evolutionary computation for manufacturing optimization:problems, solutions, and comparisons [J]. IEEE Trans Evolutionary Computation, 2000, 4(2): 93 - 113.
  • 8PanWalker S S, Iskander W. A survey of scheduling rules[J]. Operations Research, 1977, 25(1): 45 - 61.
  • 9Blazewicz J, Kobler J. Review of properties of different precedence graphs for scheduling problems [J]. European J of Operational Research, 2002, 142(3): 435- 443.
  • 10Dasgupta D, Attoh-Okine N. Immunity-based system: A survey [A]. Proc 1997 IEEE Int Conf on System, Man and Cybernetics [C]. Orlando, FL: IEEE, 1997.

共引文献13

同被引文献71

引证文献7

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部