轻型井点降水+强夯法处理地基的工艺

Technology of Light Dewatering Combining with Dynamic Consolidation in Ground Treatment
下载PDF
导出
摘要 结合某厂主装置区场地地基处理试验施工工程,针对场地的地基条件,对轻型井点联合强夯法地基处理的井点布置设计与成孔工艺进行了试验研究。根据降水要求和强夯点布置来设计井管点;对比钻孔干法、机械振动干法、水冲湿法成孔技术,最终采用了机械振动+水力洗孔联合成孔法。 Combined with the ground treatment testing project of main assembly section of a main plant site,the design and layout of well-point and the hole forming in the ground treatment of light dewatering combining with dynamic consolidation are studied considering the ground conditions.In accordance with the requirements of dewatering and the layout of dynamic consolidation test points,the well-point is designed.Compared with dry drilling,mechanical vibration dry drilling,hydraulic punching,the mechanical vibration with hydraulic punching method is adopted.
出处 《土工基础》 2010年第3期16-18,共3页 Soil Engineering and Foundation
关键词 地基处理 轻型井点降水 强夯 干法成孔 湿法成孔 ground treatment light dewatering dynamic consolidation dry drilling hydraulic punching
  • 相关文献

参考文献4

二级参考文献10

  • 1丘建金,张旷成.动力排水固结法在软基加固工程中的应用[J].工程勘察,1995,23(6):7-10. 被引量:50
  • 2Merrifield C M, Davies M C R. A study of low-energy dynamic compaction: field trials and centrfuge modelling[J]. Geoteehnique, 2000, 50 (6): 675-681.
  • 3Menard L, Broise Y. Theoretical and pracitcal aspects of dynamic consolidation[J]. Geotechnique, 1975, 25 (1):3-18.
  • 4Mitchell J K. Soil improvement state of the art report[A].The 10^th ICSMFE proceedings[C]. Stockholm: Balkem A A, 1981. 509-565.
  • 5冯遗兴,第五届全国岩土力学数值分析与解析方法讨论会论文集,1994年
  • 6叶书麟,地基处理,1988年
  • 7郑颖人,高速公路软弱地基处理理论与实践,1998年,23页
  • 8地基处理手册编写委员会.地基处理手册(第二版)[M].北京:中国建筑工业出版社,2000..
  • 9沈珠江.软土工程特性和软土地基设计[J].岩土工程学报,1998,20(1):100-111. 被引量:428
  • 10郑颖人,陆新,李学志,冯遗兴.强夯加固软粘土地基的理论与工艺研究[J].岩土工程学报,2000,22(1):18-22. 被引量:207

共引文献292

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部