摘要
对阳泉二电厂2×300MW机组“W”型火焰锅炉燃烧控制系统进行了详细的分析,重点讨论了该系统在调试及投运中应注意的问题及处理方法,并对系统的进一步完善提出了技术方面的建议。
The combustion control system of the ‘W’flame boiler in the 2300 MW units of Yangquan NO.2 Power Plant is analyzed in detail.Some noticeable problems and corresponding processing methods during the commission and operation procedures are suggested.
关键词
火焰锅炉
燃烧控制系统
机组
电厂
’Flame Boiler Combustion Control System Characteristic Test Operation