摘要
介绍了阳泉二电厂2号机组锅炉全程给水控制系统,以及在投运过程中遇到的问题及系统结构的不合理性。并针对这种特定工艺结构,提出了一种改进方案。
It introduces the fullprocess feed water regulating system for boiler of No 2 unit in Yangquan No 2 Power Plant.The problems in respect with the system structure and operation are discussed. An improvement scheme is proposed in order to solve the problem.
关键词
火焰锅炉
给水控制系统
电厂
Fullprocess Feedwater System Structure Improvement