摘要
严格控制混凝土拌合时间和坍落度,降低配合比中的用水量,避免混凝土产生早期冻害,并尽量缩短运输时间和距离,加快浇筑速度,防止热量散失过多,采取相应的保温保湿措施,以保证混凝土强度。
In order to assure the strength of concrete, mixing time and slump should be controlled strictly, as well as decreasing water amount of mix proportion, avoiding early freezing injury, reducing transportation time and distance, increasing pouring speed.
关键词
建筑工程
混凝土工程
冬季施工
质量控制
Building engineering
Concrete engineering
Construction in winter
Quality control