摘要
德国联合电力公司1990年组成后开始建设施瓦茨蓬普、鲍克斯伯格和利彭多夫等3座褐煤电厂,各装了2台800MW机组。本文了介绍施瓦茨蓬普电厂800MW机组施工和试运行的经验。该电厂于1993年10月25日奠基,至1997年5月23日并网发电。
Since VEAG was established in 1990, it has begun building three lignite-fired power plants: Schwarze Pumpe, Boxberg and Lippendorf. There are 2×800 MW units installed in each power plant. This paper reports on experience with the construction and commissioning of 800 MW units in Schwarze Pumpe power plant. The foundation stone of this project was laid on October 25, 1993 and two units were put into synchronous operation on May 23, 1997. [
关键词
褐煤电厂
机组
施工
试运行
Lignite-fired power plant 800 MW units Construction Commissioning