葛野川抽水蓄能电站设计与施工 被引量:1

Design and Construction of Kazunogawa Pumped Syorage Hydroelectric Power Station
下载PDF
导出
摘要 葛野川抽水蓄能电站是日本东京电力公司新建的第8座抽水蓄能电站。位于山梨县境内,电站总装机容量1600MW,装有4台400MW的水泵水轮发电机组。有效水头为714m,最大流量280m3/s。电站工程于1993年1月开工,计划1999年7月第1期工程竣工。届时有2台机组投入商业性运行。文中叙述了该电站的设计和施工的技术特点。 The Kazunogawa pumped storage hydroelectric power station is the eighth one of similar power stations in Tokyo Electric Power Company. It is located in Shanli county. The total installed capacity of this power station is 1 600 MW, there are four 400 MW pump-turbine units. Its effective head is 714 m, the maximum discharge is 280 m 3/s. This project started working in January 1993, the first phase engineering is scheduled to complete in July 1999. At that time, two units will be put into commercial operation. The design and the construction characteristics of this hydroelectric power station are described in this paper. [
作者 江涛
出处 《国际电力》 1999年第1期29-33,共5页
关键词 抽水蓄能电站 碾压混凝土坝 设计 施工 Pumped storage hydroelectric power station Pump-turbine Underground power house Roller compacted concrete dam Tunnel boring machine Kazunogawa
  • 相关文献

参考文献5

  • 1上条实.葛野川抽水蓄能电站的设计[J].电力土木,1994,(252):30-35.
  • 2舍川彻 右近裕之 等.葛野川抽蓄能电站葛野川坝的设计与施工[J].电力土木,1996,(262):45-52.
  • 3森吉昭 岛田保之 等.葛野川抽水蓄能电站上坝溢洪道的设计与施工[J].电力土木,1996,(264):11-18.
  • 4赤松英树 森住健太郎 等.葛野川抽水蓄能电站下坝溢道的设计[J].电力土木,1996,(266):20-27.
  • 5大石和人 山田重光 等.超高水头、大容量的葛野川抽水蓄能电站的新技术和新施工方法(座谈会)[J].电力土木,1997,(419):48-58.

同被引文献8

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部