摘要
针对火力发电厂机组设备的超期服役,以高温承压部件蒸汽管道为例,以其运行工况为基础,结合材质状况,逐步实行三级评定,计算高温承压部件的剩余寿命,利用固定资产线性折旧法对设备进行折旧计算,同时建立经济寿命的数字模型,综合评定高温承压部件的经济性,并列举了算例。
For overterm service of unit equipment in thermal plant,taking high temperature compression part(steam pipe)for example,the paper introduced a three grade appraisal method and calculated the residual life of high temperature compression part using fixed asset linear method,establised a economic life mathematical mode,finally gave out a general economy appraisal for high temperature compression part with a calculation example.
出处
《湖北电力》
1999年第1期17-19,共3页
Hubei Electric Power