摘要
建设项目跟踪审计要对项目建设的全过程进行实施监督,审计内容相当广泛,如何选择审计重点,提高审计效率,是建设项目跟踪审计必须考虑的策略问题。
Analyze experiment deficiency of teaching to existing instrument, from experiment content of courses, teaching method and teaching body,etc.preliminary reform that go on. Practice indicates, the proving experiment is transformed into employing experiment, strengthen the comprehensive design experiment, emphasize actual sample basic training of analytical method, lead teacher scientific research into experiment open experiment teaching of teaching help initiative to shift student, train students' innovation ability, improve students' overall qualities.
出处
《现代物业(中旬刊)》
2010年第4期72-73,共2页
Modern Property Management
关键词
建设项目
跟踪审计
重点
Construction project
FoUow-up auditing
Focal point