摘要 对郑州市某大型深基坑进行桩锚与土钉联合支护设计,应用FLAC3D软件对桩锚与土钉联合支护过程进行数值模拟,对各开挖过程中基坑位移场和土钉锚杆等结构单元的受力变化进行分析,模拟结果与设计计算结果基本吻合,数值模拟结果有效地指导了设计计算和现场施工过程. In order to understand goodly the reinforcement mechanism of the pile-anchor and soil nailing combined structure,optimal design and numerical simulation for a large deep excavation pit with pile-anchor and soil nailing in Zhengzhou city were done,the process of pile-anchor and siol nailing combined supporting was numerically simulated by the software FLAC3D,the displacement field of the pit and the change of the stress of siol-nail-anchor structure cell were analyzed.The simulation results were basically consistent with the design calculations results.The results of numerical simulation had effectively guidance to design and calculate,and in-site construction process.
出处 《华北水利水电学院学报》 2009年第6期89-91,共3页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 深基坑数值模拟 结构单元 桩锚与土钉联合支护 numerical simulation structure element pile-anchor and siol nailing combined structure
  • 相关文献

参考文献4

  • 1Itasca Consulting Group.Inc.USA.FLAC-3 D,Fast Lagrangian Analysis of Continua in 3 Dimensions(Version 2.1)User's Manual[Z].
  • 2北京理正软件设计研究所.北京理正深基坑支护F-SPW5.3计算软件[Z].2006.
  • 3中冶集团建筑研究总院.CECS22:2005岩土锚杆(索)技术规程[S].北京:中国计划出版社,2005.
  • 4陈泰霖,潘向丽,王安明,黄志全.郑州某深基坑工程监测与分析[J].华北水利水电学院学报,2008,29(5):76-78. 被引量:12