期刊文献+

石山口水库闸墩施工期温度分析 被引量:1

Thermal Analysis for Shishankou Reservoir Pier during the Construction Period
下载PDF
导出
摘要 分析了混凝土闸墩温度裂缝产生的原因、温度变化和温度应力发展过程。对石山口水库闸墩中增设膨胀混凝土带后的施工期温度进行了实时监测,为了解混凝土水化热温度变化规律提供了实测依据,并与普通混凝土闸墩进行对比。结果表明,在闸墩中增设混凝土膨胀带效果良好,为混凝土闸墩施工期防裂提供了一种新的方法。 The temperature change,thermal stress and the cracks caused by temperature change of Shishankou Reservoir concrete pier were studied herein.For controlling the cracks of concrete pier,an additional expansive concrete belt was laid between piers.The temperature change was monitored on real-time monitoring during construction period and compared with ordinary concrete pier.The monitor provided a basis for understanding the hydration heat of concrete,and show that the expansive concrete belt has a good effect on the crack control.
作者 解伟
出处 《水力发电》 北大核心 2010年第4期30-33,共4页 Water Power
基金 国家自然科学基金重点项目(50779018) 郑州市科技攻关项目(083STRF40344-4)
关键词 闸墩 混凝土 水化热 温度 石山口水库 pier concrete hydration heat temperature Shishankou Reservoir
  • 相关文献

参考文献14

二级参考文献46

共引文献96

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部