摘要
瀑布沟水电站是国家西部大开发的标志性工程之一。在2003年-2009年的主体工程建设阶段,业主会同设计单位,对大坝轴线位置、大坝土料运输线路、大坝基础廊道变形处理、上下游岸坡防护、下游雾化区防护治理等重大技术问题进行了深入研究,取得了良好的成效。
Pubugou Hydropower Station is one of the landmark projects of the China's Western Development. In the construction period from 2003 to 2009, the dam axis, dam soll material transportation, the treatment of dam foundation gallary deformation, the protection of upstream and downstream banks and the protection and treatment of downstream atomization areas were studied. The practice shows that the studies have achieved good results.
出处
《水力发电》
北大核心
2010年第6期8-11,共4页
Water Power
关键词
砾石土心墙堆石坝
施工技术
瀑布沟水电站
gravel soil corewall rockfill dam
construction technology
Pubugou Hydropower Station