介绍了瀑布沟水电站在建设管理过程中经过不断探索与实践,形成的具有瀑布沟建设管理特点的目标体系和方法措施,以及在探索实践中形成的建设管理特色。
The targets and countermeasures of Pubugou Hydropower Station construction were identified through continuously exploration and practice. The practices of target system, measures and methods has promoted the construction progress and quality.
出处
《水力发电》
北大核心
2010年第6期12-14,共3页
Water Power
关键词
建设管理
目标体系
探索
实践
瀑布沟水电站
construction management
target system
exploration
practice