期刊文献+

深厚覆盖层上土石坝基础廊道的结构形式探讨 被引量:9

Study on Foundation Gallery Structure and Type of Embankment Dam on Heavy Overburden
下载PDF
导出
摘要 位于深厚覆盖层的土石坝,大坝基础防渗墙在水库蓄水后往往会发生较大的变形。结合瀑布沟水电站工程实际情况,对防渗墙顶部灌浆廊道的结构设计做了有益的探讨,提出了环向结构缝下游采用加强固结灌浆处理,依据变形特点控制止水结构的方位,环向结构缝预留二期混凝土,主防渗墙在平面上采用微拱折线布置形式等具体建议,可供同类型工程参考。 The embankment dam of Pubugou Hydropower Station locates on heavy overburden. To meet the deformation of dam foundation cutoff wall after water impoundment, the grouting gallery on the top of cutoff wall was specially designed. The downstream section of circumferential structural joint of gallery is strengthened by consolidation grouting, the position of seal is fixed according to deformation characteristics, the circumferential structural joint concrete is pouring by two phase, and the axis of main cutoff wall is a arched broken-line. The experiences can be as reference for similar projects.
作者 姚福海
出处 《水力发电》 北大核心 2010年第6期54-55,59,共3页 Water Power
关键词 土石坝 灌浆廊道 结构形式 瀑布沟水电站 embankment dam grouting gallery structure Pubugou Hydropower Station
  • 相关文献

同被引文献62

引证文献9

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部