溧阳抽水蓄能电站水土流失防治措施的分析 被引量:6

Soil Erosion Control of Liyang Pumped-storage Power Station Project
下载PDF
导出
摘要 在分析溧阳抽水蓄能电站工程建设对项目区水土资源、地表植被等水土保持设施的扰动、破坏,对水土流失可能造成影响的基础上,预测工程建设期(含筹建期)和自然恢复期内可产生水土流失总量17.69万t,新增水土流失量为16.95万t;确定水土流失防治责任范围为407.52hm2,提出了水土流失分区综合防治的措施,规划了水土保持监测。 The construction of Liyang Pumped-storage Power Station will influence soil and water resources and surface vegetation. The soil erosion in preparation, construction and natural recovery periods totals to 176 900 t, in which, about 169 500 t is produced by project construction. The soil erosion control areas are 407.52 hm2. The comprehensive soil erosion control measures for different zones and the monitoring of water and soil conservation are proposed.
出处 《水力发电》 北大核心 2010年第7期22-24,共3页 Water Power
关键词 水土流失 预测 范围 措施 监测 溧阳抽水蓄能电站 soil erosion prediction range measures monitoring Liyang Pumped-storage Power Station
  • 相关文献

参考文献1

  • 1刘震.开发建设项目水土流失防治技术研究[M].北京:中国标准出版社,1999.168-169.

共引文献7

同被引文献52

引证文献6

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部