期刊文献+

溧阳抽水蓄能电站引水钢岔管设计与施工技术研究 被引量:3

Study on the Design and Construction of Diversion Steel Bifurcation in Liyang Pumped-storage Power Station
下载PDF
导出
摘要 溧阳抽水蓄能电站引水钢岔管HD值大,围岩地质条件较差(以Ⅳ类围岩为主),岔管的设计及施工是工程的关键技术问题之一。如何保证钢岔管的结构安全、施工方便和经济合理,是设计中必须解决的问题。在可行性研究阶段及可研设计审查后,对岔管的设计及施工方案进行了大量的计算分析和研究工作,对岔管的结构特性、水力特性、施工特性有了较全面的认识和了解。目前岔管的设计方案和施工方案可满足工程应用的要求。 The diversion steel bifurcation of Liyang Pumped-storage Power Station has higher HD, and the main surrounding rock is class Ⅳ rock. The design and construction of the bifurcation is one of the key technical issues. In the design of bifurcation, the structural characteristics, hydraulic characteristics and construction features were analyzed, and got a more comprehensive knowledge and understanding on it. The current design and construction programs can ensure safe structure, convenient construction and reasonable cost.
出处 《水力发电》 北大核心 2010年第7期39-42,共4页 Water Power
关键词 钢岔管 设计 施工 溧阳抽水蓄能电站 steel bifurcation design construction Liyang Pumped-storage Power Station
  • 相关文献

参考文献5

  • 1王志国,傅金筑,秦继章,等.内加强月牙肋钢岔管技术与坝后背管裂缝研究[R].水电水利规划设计总院,2004.
  • 2伍鹤阜,石长征,张启灵.溧阳抽水蓄能电站引水钢岔管三维有限元计算[R].武汉大学,2007.
  • 3张键,郑源.溧阳抽水蓄能电站引水钢岔管水头损失预测及流态分析[R].河海大学,2007.
  • 4黄细彬.溧阳抽水蓄能电站引水钢岔管水力模型试验[R].河海大学,2007.
  • 5钟秉章,陆强.溧阳抽水蓄能电站引水钢岔管计算研究[R].浙江大学,2007.

同被引文献27

引证文献3

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部