期刊文献+

瀑布沟水电站堆石坝砾石土心墙压实质量检测 被引量:1

Compaction detection of gravel-soil core in Pubugou rockfill dam
下载PDF
导出
摘要 坝高186 m的大渡河瀑布沟水电站堆石坝采用砾石土心墙,针对心墙料砾石级配范围宽、料源性质变化大、施工难度高的特点,在施工中制定了土料的压实质量控制标准和检测方法,并对检测结果进行了分析,详情予以介绍。 The 186 m high rockfill dam of Pubugou Hydropower Station is located on Dadu River.The impervious core of the dam is made of gravel-soil which has a wide grading range and varied properties.Referring to these difficulties in construction,a set of control criteria and detecting method for the compaction of the gravel-soil core is worked out and the compacting effect is analyzed.The details are described.
作者 宁全纪
出处 《水电与新能源》 2010年第4期61-63,共3页 Hydropower and New Energy
关键词 砾石土料 压实质量 控制标准 检测成果 瀑布沟水电站 gravel-soil compacting effect control criteria detecting result Pubugou Hydropower Station
  • 相关文献

参考文献2

二级参考文献5

  • 1中华人民共和国交通部.公路土工试验规程(JTJ051-93)[S].北京:人民交通出版社,1993..
  • 2中华人民共和国交通部.公路路基路面现场测试规程(JTJ059—95)[s].北京:人民交通出版社,1995..
  • 3王钊 胡海英 邹维列.路堤压实的影响因素和压实度要求.公路,2004,(8):91-96.
  • 4Head K H. Manual of Soil Laboratory Testing [M].London, Pentech Press, 1980.
  • 5王钊,骆以道,肖衡林,姚政法.运城黄土吸力特性的试验研究[J].岩土力学,2002,23(1):51-54. 被引量:14

共引文献14

同被引文献4

引证文献1

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部