摘要
针对G公司电源板生产过程中散热片装配工序存在的问题,运用"动作经济原则",结合"5W 1H"提问技术以及工作改善的"ECRS"四大原则,对其装配操作进行分析并提出改善措施。通过规范物料的摆放,使零件更加符合双手的安装和操作顺序;通过更换半圆头螺钉和改进散热片的设计,降低了装配的难度,使操作更省力。研究结果为公司进一步改进生产管理提供了借鉴。
Based on the problems of assembling Heat sink that is an inevitable workstage in the production process of power panel in G Corporation, a method combining Principle of motion economy, arraignment technology of 5W1H and four principles of ECRS to analysis the assembly operations, and propose improvement measures such as regulate the setout of supplies, change the half-round head screw and improve cooling fin. After the course has been thus improved, the parts of Heat sink are more in line with the installation and operation order of two hands as well as reducing the difficulty of assembling. It indicates that the research results are refercutial to improve the operation management of the corporations.
出处
《桂林电子科技大学学报》
2010年第3期266-269,共4页
Journal of Guilin University of Electronic Technology
关键词
方法研究
程序分析
动作经济原则
双手操作分析
method study
process analysis
principle of motion economy
two-hand process analysis