摘要
介绍了临洪河特大桥软土地基满堂支架现浇梁施工工艺,结合箱梁二次浇筑的特点,通过施工过程中采取合适的控制措施,有效防止了墩顶负弯矩区域箱梁裂缝的产生。
This paper describes the provisional ben bridge soft-situ beam bracket packed with how to ensure the quality of construction-related control measures. As well as the box girder with the charac- teristics of the second casting, through the construction process take appropriate control measures, effectively prevent the negative moment region of the pier top box girder cracks.
出处
《交通科技》
2010年第B07期24-26,共3页
Transportation Science & Technology
关键词
软土地基
现浇箱梁
施工质量控制
soft foundation
cast-in-situ box girder
quality control of construction