摘要
本文以福建省漳州港区7#泊位2413t沉箱安装为实例,介绍了200t起重船配合半潜驳安装2413t大型沉箱的施工工艺。
This article gives a brief introduction to the construction technique of installing 2413t large caisson jointly with 200t crane barge and semi-submersible barge,by expounding our 2413t caisson installation practice at No.7 berth project of Zhangzhou Port,Fujian Province.
出处
《福建建筑》
2010年第7期88-91,87,共5页
Fujian Architecture & Construction
关键词
沉箱
浮游稳定
安装
Caisson Floating stability Installation