摘要
富湾特大桥主桥上部结构为112m+2×200m+112m预应力混凝土连续刚构箱梁。主要介绍富湾特大桥边跨现浇箱梁超高钢管桩支架方案设计与施工控制,供同类桥型、同条件边跨现浇箱梁施工支架的设计与施工参考。
This paper has mainly introduced the design and construction technology control for cast-in-place super-high steel pipe pile falsework for side-spans of Fuwan Special Large Bridge,which can be used as reference for design and construction of similar cast-in-place box girder falsework.
出处
《广东公路交通》
2010年第2期35-37,共3页
Guangdong Highway Communications
关键词
边跨现浇箱梁
超高钢管桩支架
设计与施工
cast-in-place box girder of side-spans
super-high steel pipe pile falsework
Design and Construction