摘要 通过GeoStudio处理软件,对双排桩在基坑支护中的应用进行非线性有限元分析,综合考虑基坑开挖边界条件、开挖分期施工工程中参数的变化及双排桩受力特点,从计算结果中分析基坑的应力及双排桩的受力,从而可以得出用有限元法分析双排桩及双排桩在基坑支护中应用能达到良好效果的结论。 According to the GeoStudio treatment software,the paper has the non-linear finite elementary analysis of the application of the double-row pile in the foundation pit support,has the comprehensive consideration on the excavation boundary conditions for the foundation pit,the changes of parameters in the excavation stage construction,and the stressed characteristics of the double-row pile,and analyzes the stress of the foundation pit and the double-row pile from the calculation results,so as to conclude that the application of the finite elementary analysis method and the double-row pile in the foundation pit can have better effect.
出处 《山西建筑》 2010年第22期137-138,共2页 Shanxi Architecture
关键词 双排桩 有限元 基坑 double-row pile finite elementary method foundation pit
  • 相关文献

参考文献2

二级参考文献6

  • 1常洪德.浅谈深基坑支护中存在的问题及应对措施[J].山西建筑,2006,32(23):125-126. 被引量:4
  • 2GB50007-2002.建筑地基基础设计规范[S].[S].,..
  • 3YB9258-97.建筑基坑工程技术规范[S].[S].,..
  • 4黄强.深基坑支护技术[M].北京:中国建材工业出版社,1997.
  • 5DB42/159--1998湖北省深基坑工程技术规定[S].武汉:湖北省技术质量监督局,1998.
  • 6GB1202-2002,建筑地基基础工程施工验收规范[S]

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部