针对某高速公路软土地基路段,采用预压方案进行处理,实践证明:高速公路部分预压段施工中,通过加强观测,并充分利用观测资料进行实时跟踪调整既有设计方案,保证了项目的良好运行,并取得了较优的经济效益。
Aiming at the adoption of the prestressed scheme in the soft roadbed section of some express road,the paper proves the smooth operation of the program can be ensured by improving observation and applying the observation data to have time follow-up adjustment for the existing design scheme in the partial prestressed section of the express road,so better economic benefits are achieved.